1958

Moving FROM ALLGÄU TO WEINGARTEN


1958

1958

Take over of „Neuburger Hof

Taking over the traditional Hotel “Neuburger Hof” in Weingarten as a leasehold.

Purchase of a property on Burachstraße

1958

1962

CONSTRUCTION OF THE FIRST BED AND BREAKFAST HOTEL

Construction of the first Bed and Breakfast hotel in Ravensburg.

Management until return of the leased Hotel „Neuburger Hof“.

At this point, besides breakfast, the hotel was able to offer dinner by request.

1962

1967 - 1968

AQUISITION OF PROPERTY

 Purchase of another property in front of the Bed and Breakfast Hotel on Burachstrasse.

New construction of the first hotel, with 36 rooms, all equipped with a sink and shower separated by a curtain from the rest of the room, which was considered very comfortable for its time standard.

1967 - 1968

1979 -1981

DEMOLITION OF THE BED AND BREAKFAST HOTEL

The hotel had kept the founding walls in the demolition because of the new construction regulations, which had made the restauration very complicated and unviable.

1979 -1981

1984 - 1985

REFURBISHMENT

Due to the refurbishment of the building, separated bathrooms were built resulting in a reduction to 28 rooms from the 36 rooms.

1984 - 1985

1988

RENOVATION OF THE ROOF

Extensive renovation of the roof and external facade

1988

1988 - 1990

REFURBISHMENT OF THE RESTAURANT

A fundamental refurbishment of the a la carte restaurant had brought the restaurant to a conceptual change.

1988 - 1990

1991

ATTIC EXTENTION

The attic had turned into a 3 rooms floor with our exclusive “Welfensuite” and two romantic rooms.

.

1991

1992 - 1993

LAUNDRY ROOM UPGRADE

The laundry room were then equipped with new machinery to keep up with the enhancement of the hotel. Financial reasons lead to a part conversion to natural gas.

Our laundry service is still successfully being managed in the hotel.

1992 - 1993

1996 - 1997

EXTENSION AND REDESIGN

The entrance hall was extended and redesigned into a modern communication niche.

1996 - 1997

1999

´THE BEGINING OF THE COMPUTER ERA

 The begining of the Computer Era at „Altdorfer Hof“with Protel (Hotelsoftware).

1999

2000

CONVERSION IN THE GUEST HOUSE

5 staff rooms located in our guest house were into business rooms equipped with a big desk, queen-size bed and modem connection

2000

2001

EXTENSION OF THE CONFERENCE ROOM

Extension and modern design of our conference room had enabled us to fulfil most of our guest´s expectations

2001

2002

4 EXCLUSIVE JUNIOR SUITES

Total renovation of 4 double rooms in our main building into Junior suites.

2002

2004

RENOVATION OF THE CANOPY

The renovation of the canopy has resulted into comfortable interconnecting rooms

2004

2005

COGENERATION UNITS

Installation of two cogeneration units and simultaneously an upgrade of the heating system in all rooms.

2005

2007 - 2008

DSL Access

Installation of DSL Access in most of the rooms.

2007 - 2008

2011

CHRISTIAN UNGLERT TAKES OVER

Christian Unglert takes over his family business – supported by his fiancée Meike Klenner and by his mother.

Meike Klenner has been working for a long time at the hotel.

Their first son Niklas Florin Unglert was born on June 29th 2011.

Unfortunately, the esteemed senior Director Alfons Unglert passed away in February 2011.

2011

2012

PAVILLON AS EXTENSION OF THE RESTAURANT

The Pavillion was built according to Alfons und Gertrud Unglert’s plans.
It allocates 40 people and has a buffet with a stove.

We also have rearranged our terrace and playground.

On December 12th 2012, Christian and Meike Unglert had their civil wedding at Schlössle

2012

2013

WEDDING AND FAMILY

On Mai 25th 2013, Christian and Meike Unglert got married at church Basilika Birnau.

In August they have their second son Jakob Bennet.

2013

2014

COLD STORAGE

Renovation of the Kitchen and construction of a new cold storage

2014

2015

FIRE ALARM SYSTEM

Installation of a modern fire alarm system

2015

2016

AIR CONDITIONING, NATURAL GAS & TECHNOLOGY

Huge renovation in our guest house.
Six geothermal boreholes with a depth of 150 m each for our new air conditioning acquisition.
60 new Smart-TVs were bought and a new locker system with card and pin code was installed in both houses

2016

2017

END OF THE RENOVATION

We refurbished 13 rooms, 20 bathrooms and 3 hallways in our Guest house.
We have also improved the fire protection system.
Thinking of our guest´s comfort we have installed in 27 rooms Rain shower system, air conditioning and Whirlpool with TV – by request.

2017

2018

50 YEARS ALTDORFER HOF

50 Anniversary Altdorfer Hof – Celebrated on Juli 15th 2018.

2018

2019

REFURBISHMENT OF SOME ROOMS

Some rooms in our main building are being refurbished.

2019